Energy infrastructure
Execution of works on Wind Power Plant Krnovo (72 MW)

Krnovo
Execution of works on Wind Power Plant Krnovo (72 MW)
Execution of works on Wind Power Plant Krnovo (72 MW)
Execution of works on Wind Power Plant Krnovo (72 MW)

Project Description:
Execution of civil works

Investor:
Porr Bau GmbH Beč
d.s.d. Podgorica

The total investment value:
5.942.721,72 €

The year of construction:
2015.

Design, supply of equipment and construction of connecting 110 kV cable line Niksic – Klicevo
Municipality of Nikšić
Design, supply of equipment and construction of connecting 110 kV cable line Niksic – Klicevo
Design, supply of equipment and construction of connecting 110 kV cable line Niksic – Klicevo
Design, supply of equipment and construction of connecting 110 kV cable line Niksic – Klicevo

Project Description:
Making of main design and execution of construction and construction-craft works, and works on high voltage electrical installations

Investor:
Montenegrin Electrical Transmission System
Podgorica

The total investment value:
3.325.026,62 €

The year of construction:
2014- 2015

Making of main design and construction TS 35/10 kV, 2x8 MVA “Popovići”, by system “turnkey”

Municipality of Bar
Making of main design and construction TS 35/10 kV, 2x8 MVA “Popovići”, by system “turnkey”
Making of main design and construction TS 35/10 kV, 2x8 MVA “Popovići”, by system “turnkey”
Making of main design and construction TS 35/10 kV, 2x8 MVA “Popovići”, by system “turnkey”

Project Description:
Making of main design TS (construction and electro-energetic part)
Execution of preparation, ground, concrete, reinforced-concrete works, works on installation of strong and weak electric power, hydro technical installations, terrain arrangement and installation of facility and equipment.

Investor:
EPCG AD Nikšić
FU Distribution

The total investment value:
1.499.400,00 €

The year of construction:
2014. - 2015.