Energy infrastructure
Substation "Buce" 35/10kV
Berane
Substation "Buce" 35/10kV
Substation "Buce" 35/10kV
Substation "Buce" 35/10kV

Project Description:
Execution of construction works on the substation "Buce" 35/10Kv.

Investor:
Hidroenergija LLC Berane

The total investment value:
972.271,00€

The year of construction:
2014.-2015.

Construction of substation Kolašin
Kolašin
Construction of substation Kolašin
Construction of substation Kolašin
Construction of substation Kolašin

Project Description:
Making of main design and construction of substation 35/10 kV, 2x8 MVA Breza-Kolašin

Making of main design for substation (construction and electro-energetic part).
Execution of preparation, ground, concrete, reinforced-concrete works, works on installations of strong and weak electric power, hydro technical installation, terrain arrangement and installation of facility and equipment.

Investor:
EPCG AD Nikšić
FU Distribution

The total investment value:
1.661.400,00 €

The year of construction:
2012 - 2013.

Construction works for power plants Ashta 1 and Ashta 2, in Albania
Albania
Construction works for power plants Ashta 1 and Ashta 2, in Albania
Construction works for power plants Ashta 1 and Ashta 2, in Albania
Construction works for power plants Ashta 1 and Ashta 2, in Albania

Name and place of the facility:
Construction works for power plants Ashta 1 and Ashta 2, in Albania Kolasin (as the the main subcontractor of Porehr Tnobau And Umvelt Company, Austria)

Execution of ground works that involved excavation of 2.613.371, 00 m3 in material of all categories and embankment making of 1.596.463,00 m3 of all material categories.

Investor:
Porr Tehnobau
and
Umvelt, Austria

The total investment value:
20.882.095,73 €

The year of construction:
2010 - 2012.